Installed a global manufacturer’s first high-speed, state-of-the-art packaging line
Coordinated mechanical, electrical, and controls scopes
Established a benchmark for throughput, reliability, and technology adoption
Designed and implemented a polished stainless steel raw material handling system
Integrated RO water distribution and food-grade components
Ensured hygienic design compliance with GMP standards
Installed automated pallet conveyors and truck loading interface
Reduced manual labor and ergonomic risks
Improved loading speed and outbound logistics tracking
Verified all process and utility piping across the facility
Updated 300+ PFDs and P&IDs for alignment with as-built conditions
Updated a nearly 1million square foot facilty's layout streamlining to improve file performance.
Updated and managed Autodesk Vault drawing management system from unreliable to most up to date it has ever been.